|
|
|
|
|
|
The Digging is finished as the Wascana Lake project
gets ready for water
|
|
|
|
|
|
FTLComm - Regina - Wednesday, March 23, 2004, images by: R. W. Shire |
Monday with the sun shining and a chilly March wind blowing
our intrepid photographer set off down Albert Street to catch the action in Wascana
Lake. Actually he was not alone as there were lots of people watching the project
as it is in its final stages for this year.
Perhaps the most unusual site was the two frontend loaders dumping bucket to bucket
as one in the lake was passing excess sand up to another behind the new breakwater.
These pictures (below, click to enlarge) are presented in sequence and show the project
as the lake is now at its depth and all along the north and south shoreline the forms
are in place to pore a concrete breakwater.
Just east of the Albert Street bridge is the construction on the new pedestrian and
bicycle bridge which will take foot traffic from the busy thoroughfare.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Return to Ensign
- Return to Saskatchewan
News
|
|
This page is a story posted on Ensign and/or Saskatchewan
News, both of which are daily web sites offering a variety of material from scenic
images, political commentary, information and news. These publications are the work
of Faster Than Light Communications . If you would like to comment on this story or you wish to contact
the editor of these sites please send us email. |
|
Editor : Timothy W. Shire
Faster Than Light Communication
Box 1776, Tisdale, Saskatchewan, Canada, S0E 1T0
306 873 2004
|
|